4 to 3/4 in. The most common underdrains are known as UD 4 and UD 7. The compaction equipment will ride on the native soil and not allow for proper consolidation of backfill. SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC. 296 0 obj <> endobj % The mandrel shall be fabricated of metal, fitted with pulling rings at each end, stamped or engraved on some segment other than a runner with the nominal pipe/culvert size and mandrel outside diameter. + (12 in. Culvert Profile. Trenching should be completed in existing soils with sidewalls reasonably vertical to the top of the pipe. Alternative Project Delivery | Construction| Cost Estimation Office| Local Assistance |Location and Design | Maintenance |Materials |Office of Land Use | Operations | Project Management Office | Right of Way/Utilities | Structure and Bridge |Traffic Engineering | Transportation and Mobility Planning. The moisture content at which a soil can be compacted to its maximum dry density with the least amount of comparative effort is called the optimum moisture content. kYPPc^KZ\"}JT9VBd[ /Le UJs]VOk:SZ hb```f``2g`2X@Y809wCc cRBTK@S0UYB:d P&t%iV'XhS:Ku.0%7Q4~Av{iL^$x0%Prmc*700x\65;kYw;^(ew5efv] qKZS;\c zr Gg^tL)QMpJhzHrEO *~\,g -. \@%+TB)9~D ru^j:c;1JJ u]5ZU._] ueV^+/5 794 (d), please call 800-367-7623. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal, SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. VDOT states 75 years for higher functional classification roads and 50 years for lower functional classification roads. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Another option with the flared bell is the Modified Tongue & Groove, or Baby Bell which is a cross between a straight walled T&G and a Standard Bell it does not stick out from the barrel as far as a flared bell. 4 in.) 15) In the case of UD 4, the Open Graded Drainage Layer (OGDL) is placed on top of the completed trench. Length of run = 856 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 3) (36 in. When performing a manual visual inspection: There must be adequate crawl/walking space and VDOT Safety Policy and Procedure #8 Confined Space Entry Policy and Procedure must be followed. SUMP DRAINS 7-3 7.3. The values are often affected by varying percentages of large aggregate which consultants and contractors do not usually put into consideration. of the rammer used to compact the soil or soil and aggregate mixture in the mold and the number of layers placed into the compaction mold for compaction. SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE, Division 2 Section 32 14 13.19 Section 02795. Some links may require the Adobe Reader. (Zero Air Voids = ZAV). Soiltight joints provide protection against infiltration of backfill material containing high percentage of coarse grain soils, and are influenced by the size of the opening (maximum dimension normal to the direction that the soil may infiltrate) and the length of the channel (length of the path along which the soil may infiltrate). Excavate Trench Proper trench widths will allow for proper compaction alongside the pipe. Shop drawings, 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction, SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. <>/Metadata 1689 0 R/ViewerPreferences 1690 0 R>> 0 Weigh clean dry container and record weight. TThe Construction Materials Testing Soils exam is delivered on a computer at Pearson Vue Testing Centers. 3) What are the testing requirements for backfilling around pipe? Concrete Field - Current ACI must be submitted to MaterialsCertification@vdot.virginia.gov ; Soils and Aggregate Compaction - Physical demonstration of proficiency - scheduled by CCWA **New **Central Mix Aggregate Plant - Physical demonstration of proficiency - scheduled by CCWA **New** To learn about CHANGES up to 2018, please review the . Please click on the course title to see the full course description. 16) What is the level of compaction required for pipe backfill? Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. americanwick.com 800.242.WICK (9425). San Antonio Water System Standard Specifications for Construction ITEM NO. We encourage you to plan accordingly and register soon, to allow ample time for your staff to meet all the requirements needed for recertification. To use this website, you must agree to our, SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701), State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS, SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS, Wastewater Capital Projects Management Standard Construction Specification, Section 02702 SEWER PIPE INSTALLATION AND TESTING, SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION. A REVIEW OF THE USE OF RECLAIMED ASPHALT - Read online for free. If vibratory rollers are used in the backfill operations, vibratory motors shall not be activated until at least 3 feet of backfill has been placed and compacted over the pipe. 5) Open only as much trench as can be safely maintained by available equipment. When backfill is below spring line of pipe, compact next to pipe first and work towards the trench wall. The fill above the top of the regular backfill shall be installed and completed as specified for embankment construction. Your one-stop source for VDOT maps, data and project info. PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. Bierolson. STORM SEWER CALCULATIONS 7-4 7.6. Additionally, a copy shall be furnished to local VDOT Asset Management personnel to document the pipe/culvert condition at that point in time. The specific locations are shown on the plans. Enrollment can be completed on through Germanna Community College or CCWA. All materials and workmanship, TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20, RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover, SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. At the engineer of record's. 200 sieve. Find the right form for you and fill it out: VisitingProfessorofLaw,StanfordLawSchool(W No results. Please check your spelling or try another term. GRIT Manual. Rubber gaskets may be used when the joint slope is five degrees or less, however it is usually limited to mastic or butyl sealants. 402.02. This type of joint provides a leak resistant joint when a profile gasket is used. Heavily compacted soils contain few large pores, less total pore volume and, consequently, a greater density. What is the moisture content at which soil begins to behave like a liquid called? endobj The side is called the drainage side. When backfill material is above the spring line of the pipe, start at the trench wall and work towards the pipe. 1 (do not test 1st lift) = 2) = 14 tests required per 300 (Answer) Pipe Testing Frequency Example 2: Pipe Diameter = 36 in. 11) Backfill depth is at least equal to the diameter of the pipe. 5) Install pipe to grade 6) Compact structural bedding outside the middle third of the pipe 7) Place structural bedding in lifts 8) Complete structural backfill operation by working from side to side of the pipe, differential not to exceed 24 or 1/3 size of pipe. It is generally easier to install due to less stringent lubrication requirements for the gasket. Walls that carry extra, TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines, SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. 1.02 REFERENCES, PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. PurRoses 1. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix B | 2 Other methods of stabilization, such as geo fabrics may be appropriate based on the engineer s judgment. SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE. Road and Bridge Standards. endstream endobj startxref SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel, SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. From this we can highlight the following requirements: Visual/ Video Inspection is required on: All Storm Sewer Pipes (100%) Selected Number of Pipe Culverts (>10%) 2016v1.0 Chapter 4 15, 16 Must be done with VDOT Rep Present Conducted no sooner than 30 days after completion of Installation and placement of final cover (except pavement). The spigot end of the pipe contains a confined groove for the gasket to seat, where an o ring gasket is placed. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily, 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS, SECTION 9 SEWER/DRAINAGE LINES 9.1 GENERAL This section covers the requirements for piping materials and installation in the Cedar Hills City sewer and drainage collection system. 2016v1.0 Chapter 4 16, 17 PAVEMENT DRAINS Pavement subsurface drainage is essential in obtaining a well performing pavement, whether it is flexible, rigid or composite. 13) What is the maximum allowed crack size of a rigid pipe? Unsuitable foundations must be stabilized at the engineer s direction. As a reminder, all certification courses are available either online or through a self-study option at the respective community colleges. Concrete Field - Current ACI must be submitted to MaterialsCertification@vdot.virginia.gov ; Soils and Aggregate Compaction - Physical demonstration of proficiency - scheduled by CCWA **New **Central Mix Aggregate Plant - Physical demonstration of proficiency - scheduled by CCWA **New** To learn about CHANGES up to 2018, please review the . 6) Line the trench with the non woven drainage fabric. Figure 4.1: Precast Concrete Pipe 2016v1.0 Chapter 4 1, 2 BASIC PIPE AND SOIL CONCEPTS The type of pipe selected for a particular application depends on many factors. Fine particles are more sensitive to the presence of water than coarse particles. The components of an underdrain system are: 1) Trench 2) Non woven geotextile drainage fabric 3) Perforated longitudinal pipe (min. Importance to Maintenance & Water Quality. 10) Backfill the trench using clean #8 or #57 aggregate as soon as practical, but not later than the end of each working day. JnqYj A"@. 309 0 obj <>/Filter/FlateDecode/ID[<8C7926BE3CE0893EFFE3D4D04181CA9C><5F163F4C9BEAEE4B999AF08BC3EDB7FD>]/Index[296 27]/Info 295 0 R/Length 74/Prev 443524/Root 297 0 R/Size 323/Type/XRef/W[1 2 1]>>stream True or false: Open graded aggregates are used in pavement to give the structure more strength. The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. "Understanding soils is the key to becoming a well-rounded special inspector. Lane provides the complete product line to meet all your HDPE drainage needs -, Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Drop Inlet Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) x 12 inches /foot = Depth of backfill in inches 1) 9ft. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. Structure Earthwork: 02200. `*r[anyv What term describes the distribution of various particle sizes with the material? The foundation is to be explored below the bottom of the excavation to determine the type and condition of the foundation. For larger diameter pipe, >30 inches, embedment materials should be worked under the haunches by hand. Importance to Maintenance & Water Quality. 4 in.) For flexible pipe this begins 12 over top of pipe for smaller pipe and 18 for pipe 54 and larger. The exploration should extend to a depth equal to per foot of fill height or 8, whichever is greater. All materials, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices, CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. False. SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Your one-stop source for VDOT maps, data and project info. # u If performed improperly, soil density settlement of the soil could occur and result in unnecessary maintenance costs or structure failure. What is the behavior of a material where the material deforms under load and does not return to its original shape called? PMO Instructional and Informational Memoranda. Description. 322 0 obj <>stream 7) What is the maximum height of cover for a 48 inch pipe diameter Class IV concrete pipe culvert? 2016v1.0 Chapter 4 11, 12 Types of Joints for Concrete Pipe Tongue & Groove: A bell & spigot type joint with straight walls (flush bell). Geotechnical Design Parameters for Retaining Walls, Sound Barrier Walls and Non-Critical Slopes. stream This website includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia. There is still an opportunity to test on the last day of class; however there is . This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including, BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. What is the moisture content at which soil can be compacted to its maximum dry density with the least amount of comparative effort called? The Soils and Aggregate Inspector Certification Course is designed for those individuals responsible for the sampling and testing of soils and aggregates used in base, subbase and roadway embankment construction. 16) In the case of UD 7, as asphalt concrete cap is used to complete the backfilling and provide the final surface that is even with the shoulder. Minimum/Maximum Cover All Culverts 24 minimum cover Absolute minimum fill height (12 ) Except for entrances (9 minimum) All pipe should have three feet of cover on it before construction traffic is allowed across it. SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. General: Submit the following in accordance with The General Conditions. No. Trench excavation, backfill, and compaction; Section 02250. Grade Adjustment of Existing Miscellaneous Structures 600-8 3. The function of the pipe, the soil type present in the trench, the depth of the pipe can all influence the type of pipe selected. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and, 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.